Completed Residential & Structural Projects Across London
Explore our architectural engineering portfolio. From double-story rear extensions and L-shaped dormer lofts to whole-house structural reconfigurations delivered out of 16c Chatsworth Rd, Hayes UB4 9ES.
Double-Story Wrap-Around Addition
Engineered a ground-floor kitchen diner featuring bi-folding glass doors and roof lanterns, combined with two first-floor bedrooms and en-suite facilities above.
Master Attic Bedroom Suite
Converted a Victorian roof void into a master bedroom en-suite with glass Juliet balcony doors, custom eaves storage, and structural stairwell integration.
Whole-House Open-Plan Remodel
Removed central load-bearing walls to construct a unified living-dining space, combined with complete electrical rewiring, new plumbing, and plastering.
Single-Story Rear Kitchen Build
Constructed a 6-metre deep rear kitchen extension under the Larger Home Extension scheme, installing aluminum bi-fold doors and dual flat glass lanterns.
New Build Foundation Groundworks
Executed full site excavation, soil load testing, deep trench fill concrete pouring, and Thames Water public sewer build-over alignment for a new build home.
Mansard Loft & En-Suite Addition
Erected a full mansard loft extension with slate external tiling, dormer windows, custom wardrobes, and high-spec walk-in shower room.
Portfolio Performance & Delivery Matrix
Statistical comparison of project timelines, statutory approvals, and value addition across West London properties.
| Project Type | Location | Average Timeline | Statutory Approval | Property Value Increase |
|---|---|---|---|---|
| Velux Loft Conversion | Hayes UB4 | 4 - 5 Weeks | Permitted Development | +15% to +18% |
| L-Shaped Rear Dormer | Ealing W5 | 6 - 8 Weeks | Permitted Development | +20% to +25% |
| Single Story Rear Extension | Hounslow TW3 | 8 - 10 Weeks | Prior Approval (Larger Scheme) | +18% to +23% |
| Double Story Wrap-Around | Hayes UB3 | 11 - 14 Weeks | Full Planning Permission | +25% to +35% |
| Whole-House Renovation | Uxbridge UB8 | 8 - 12 Weeks | Building Control Approved | +20% to +28% |
Completed Projects Area Directory
Akaal Construction delivers turnkey building services across West London and surrounding home counties:
